Ensure the thermal insulation boards (EPS, XPS, or Mineral Wool) are properly positioned and initially bonded to the substrate according to the system guidelines.
1
Insert a suitable screw (wood or metal screw) through the central hole of the Pad. Position the Pad at the designated fixing point on the insulation board and drive the screw into the substrate.
2
Tighten the screw until the Pad is flush with the surface of the insulation board. Note: The Pad should be pressed firmly against the insulation but not overtightened to the point of crushing the board or creating a deep depression.
3